12.1.3 Continuous Load Path and Interconnection
SBC 301 · Edition 2024 · p. 68
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clauseUnder this clause
- 12.1.3.1 A continuous load path, or paths, with adequate strength and stiffness to transfer all forces from the point of application to the final point of resistance shall be provided.
- 12.1.3.2 All parts of the structure between separation joints shall be interconnected to form a continuous path to the seismic force-resisting system, and the connections shall be capable of transmitting the seismic force (Fp) induced by the parts being connected.
- 12.1.3.3 Any portion smaller than the whole structure shall be tied to the remainder of the structure with elements having design strength consistent with the requirements of Section 12.1.3.3.
- 12.1.3.4 The connection design forces shall not exceed the maximum forces that the structural system is capable of transferring to the connection points.