11.8.2 Geotechnical investigation report requirements for seismic design categories (C through F)
SBC 301 · Edition 2024 · p. 64
A geotechnical investigation report shall be submitted for a structure assigned to seismic design category (C, D, E, or F) in accordance with the requirements of (Section 11.8). An investigation shall be conducted and a report shall be submitted that…
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause