J107.2 Surface preparation.
SBC 201 · Edition 2024 · p. 768
The ground surface shall be prepared to receive fill by removing vegetation, topsoil and other unsuitable materials, and scarifying the ground to provide a bond with the fill material.
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause