العربيةSign inSign up free

J107.2 Surface preparation.

SBC 201 · Edition 2024 · p. 768

The ground surface shall be prepared to receive fill by removing vegetation, topsoil and other unsuitable materials, and scarifying the ground to provide a bond with the fill material.

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 201 J107.2: Surface preparation. | Emtithal