909 SMOKE CONTROL SYSTEMS
SBC 201 · Edition 2024 · p. 337
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clauseUnder this clause
- 909.1 Scope and purpose.
- 909.2 General design requirements.
- 909.3 Special inspection and test requirements.
- 909.4 Analysis.
- 909.5 Smoke barrier construction.
- 909.6 Pressurization method.
- 909.7 Airflow design method.
- 909.8 Exhaust method.
- 909.9 Design fire.
- 909.10 Equipment.
- 909.11 Standby power.
- 909.12 Detection and control systems.
- 909.13 Control air tubing.
- 909.14 Marking and identification.
- 909.15 Control diagrams.
- 909.16 Fire fighter’s smoke control panel.
- 909.17 System response time.
- 909.18 Acceptance testing.
- 909.19 System acceptance.
- 909.20 Smokeproof enclosures.
- 909.21 Elevator hoistway pressurization alternative.