426.1.7 Tire rebuilding.
SBC 201 · Edition 2024 · p. 140
Buffing operations shall be located in a room separated from the remainder of the building housing the tire rebuilding or tire recapping operation by a 1-hour fire barrier.
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause