العربيةSign inSign up free

426.1.7 Tire rebuilding.

SBC 201 · Edition 2024 · p. 140

Buffing operations shall be located in a room separated from the remainder of the building housing the tire rebuilding or tire recapping operation by a 1-hour fire barrier.

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause

Under this clause

SBC 201 426.1.7: Tire rebuilding. | Emtithal