العربيةSign inSign up free

417.1 General.

SBC 201 · Edition 2024 · p. 134

A drying room or dry kiln installed within a building shall be constructed entirely of approved noncombustible materials or assemblies of such materials regulated by the approved rules or as required in the general and specific sections of this chapter…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause