415.11 Group H-5.
SBC 201 · Edition 2024 · p. 128
In addition to the requirements set forth elsewhere in this code, Group H-5 shall comply with the provisions of Sections 415.11.1 through 415.11.12 and SBC 801.
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clauseUnder this clause
- 415.11.1 Fabrication areas.
- 415.11.2 Corridors.
- 415.11.3 Service corridors.
- 415.11.4 Emergency alarm system.
- 415.11.5 Storage of hazardous production materials.
- 415.11.6 HPM rooms, gas rooms, liquid storage room construction.
- 415.11.7 Piping and tubing.
- 415.11.8 Continuous gas detection systems.
- 415.11.9 Manual fire alarm system.
- 415.11.10 Emergency control station.
- 415.11.11 Emergency power system.
- 415.11.12 Automatic sprinkler system protection in exhaust ducts for HPM.