3304.1 Excavation and fill.
SBC 201 · Edition 2024 · p. 689
Excavation and fill for buildings and structures shall be constructed or protected so as not to endanger life or property. Stumps and roots shall be removed from the soil to a depth of not less than 300 mm below the…
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause