3103.1 General.

SBC 201 · Edition 2024 · p. 674

The provisions of Sections 3103.1 through 3103.4 shall apply to structures erected for a period of less than 180 days. Special event structures, tents, umbrella structures and other membrane structures erected for a period of less than 180 days shall…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.