العربيةSign inSign up free

2702.2.9 Group I-3 occupancies.

SBC 201 · Edition 2024 · p. 652

Emergency power shall be provided for power- operated doors and locks in Group I-3 occupancies as required in Section 408.4.2 .

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 201 2702.2.9: Group I-3 occupancies. | Emtithal