العربيةSign inSign up free

2702.1 Installation.

SBC 201 · Edition 2024 · p. 651

Emergency power systems and standby power systems shall comply with Sections 2702.1.1 through 2702.1.8 .

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause

Under this clause

SBC 201 2702.1: Installation. | Emtithal