العربيةSign inSign up free

2409.1 Glass walkways.

SBC 201 · Edition 2024 · p. 621

Glass installed as a part of a floor/ ceiling assembly as a walking surface and constructed with laminated glass shall comply with ASTM E2751 or with the load requirements specified in Chapter 16. Such assemblies shall comply with the fire-resistance…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 201 2409.1: Glass walkways. | Emtithal