202 DEFINITIONS
SBC 201 · Edition 2024 · p. 43
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clauseUnder this clause
- 202 24-HOUR BASIS 24-HOUR BASIS.
- 202 AAC MASONRY AAC MASONRY.
- 202 ACCESSIBLE ACCESSIBLE.
- 202 ACCESSIBLE MEANS OF EGRESS ACCESSIBLE MEANS OF EGRESS.
- 202 ACCESSIBLE ROUTE ACCESSIBLE ROUTE.
- 202 ACCESSIBLE UNIT ACCESSIBLE UNIT.
- 202 ACCREDITATION BODY ACCREDITATION BODY.
- 202 ADDITION ADDITION.
- 202 ADHERED MASONRY VENEER ADHERED MASONRY VENEER.
- 202 ADOBE CONSTRUCTION ADOBE CONSTRUCTION.
- 202 ADOBE, STABILIZED ADOBE, STABILIZED.
- 202 ADOBE, UNSTABILIZED ADOBE, UNSTABILIZED.
- 202 AEROSOL CONTAINER AEROSOL CONTAINER.
- 202 AEROSOL PRODUCT AEROSOL PRODUCT.
- 202 LEVEL 1 AEROSOL PRODUCTS LEVEL 1 AEROSOL PRODUCTS.
- 202 LEVEL 2 AEROSOL PRODUCTS LEVEL 2 AEROSOL PRODUCTS.
- 202 LEVEL 3 AEROSOL PRODUCTS LEVEL 3 AEROSOL PRODUCTS.
- 202 AGGREGATE AGGREGATE.
- 202 AGRICULTURAL BUILDING AGRICULTURAL BUILDING.
- 202 AIR-IMPERMEABLE INSULATION AIR-IMPERMEABLE INSULATION.
- 202 AIR-INFLATED STRUCTURE AIR-INFLATED STRUCTURE.
- 202 AIR-SUPPORTED STRUCTURE AIR-SUPPORTED STRUCTURE.
- 202 DOUBLE SKIN DOUBLE SKIN.
- 202 SINGLE SKIN SINGLE SKIN.
- 202 AISLE AISLE.
- 202 AISLE ACCESS-WAY AISLE ACCESS-WAY.
- 202 ALARM NOTIFICATION APPLIANCE ALARM NOTIFICATION APPLIANCE.
- 202 ALARM SIGNAL ALARM SIGNAL.
- 202 ALARM VERIFICATION FEATURE ALARM VERIFICATION FEATURE.
- 202 ALLOWABLE STRESS DESIGN ALLOWABLE STRESS DESIGN.
- 202 ALTERATION ALTERATION.
- 202 ALTERNATING TREAD DEVICE ALTERNATING TREAD DEVICE.
- 202 AMBULATORY CARE FACILITY AMBULATORY CARE FACILITY
- 202 ANCHOR BUILDING ANCHOR BUILDING.
- 202 ANCHORED MASONRY VENEER ANCHORED MASONRY VENEER.
- 202 ANNULAR SPACE ANNULAR SPACE.
- 202 ANNUNCIATOR ANNUNCIATOR.
- 202 APPROVED APPROVED.
- 202 APPROVED AGENCY APPROVED AGENCY.
- 202 APPROVED FABRICATOR APPROVED FABRICATOR.
- 202 APPROVED SOURCE APPROVED SOURCE.
- 202 AREA (for masonry) AREA (for masonry).
- 202 GROSS CROSS-SECTIONAL GROSS CROSS-SECTIONAL.
- 202 NET CROSS-SECTIONAL NET CROSS-SECTIONAL.
- 202 AREA, BUILDING AREA, BUILDING.
- 202 AREA OF REFUGE AREA OF REFUGE.
- 202 AREA OF SPORT ACTIVITY AREA OF SPORT ACTIVITY.
- 202 AREAWAY AREAWAY.
- 202 ASSEMBLY SEATING, MULTILEVEL ASSEMBLY SEATING, MULTILEVEL.
- 202 ATRIUM ATRIUM.
- 202 ATTIC ATTIC.
- 202 AUDIBLE ALARM NOTIFICATION APPLIANCE AUDIBLE ALARM NOTIFICATION APPLIANCE.
- 202 AUTOMATIC AUTOMATIC.
- 202 AUTOMATIC FIRE-EXTINGUISHING SYSTEM AUTOMATIC FIRE-EXTINGUISHING SYSTEM.
- 202 AUTOMATIC SMOKE DETECTION SYSTEM AUTOMATIC SMOKE DETECTION SYSTEM.
- 202 AUTOMATIC SPRINKLER SYSTEM AUTOMATIC SPRINKLER SYSTEM.
- 202 AUTOMATIC WATER MIST SYSTEM AUTOMATIC WATER MIST SYSTEM.
- 202 AVERAGE AMBIENT SOUND LEVEL AVERAGE AMBIENT SOUND LEVEL.
- 202 AWNING AWNING.
- 202 BACKING BACKING.
- 202 BALANCED DOOR BALANCED DOOR.
- 202 BALED COTTON BALED COTTON.
- 202 BALED COTTON, DENSELY PACKED BALED COTTON, DENSELY PACKED.
- 202 BALLAST BALLAST.
- 202 BARRICADE BARRICADE.
- 202 ARTIFICIAL BARRICADE ARTIFICIAL BARRICADE.
- 202 NATURAL BARRICADE NATURAL BARRICADE.
- 202 BASE FLOOD BASE FLOOD.
- 202 BASE FLOOD ELEVATION BASE FLOOD ELEVATION.
- 202 BASEMENT BASEMENT.
- 202 BASEMENT (for flood loads) BASEMENT (for flood loads)
- 202 BEARING WALL STRUCTURE BEARING WALL STRUCTURE.
- 202 BED JOINT BED JOINT.
- 202 BLEACHERS BLEACHERS.
- 202 BOARDING HOUSE BOARDING HOUSE.
- 202 BOILING POINT BOILING POINT.
- 202 BRACED WALL LINE BRACED WALL LINE.
- 202 BRACED WALL PANEL BRACED WALL PANEL.
- 202 BREAKOUT BREAKOUT.
- 202 BRICK BRICK.
- 202 CALCIUM SILICATE (SAND LIME BRICK) CALCIUM SILICATE (SAND LIME BRICK).
- 202 CLAY OR SHALE CLAY OR SHALE.
- 202 CONCRETE CONCRETE.
- 202 BUILDING BUILDING.
- 202 BUILDING AREA BUILDING AREA.
- 202 BUILDING ELEMENT BUILDING ELEMENT.
- 202 BUILDING HEIGHT BUILDING HEIGHT.
- 202 BUILDING LINE BUILDING LINE.
- 202 BUILDING OFFICIAL BUILDING OFFICIAL.
- 202 BUILDING-INTEGRATED PHOTOVOLTAIC (BIPV) PRODUCT BUILDING-INTEGRATED PHOTOVOLTAIC (BIPV) PRODUCT.
- 202 BUILDING-INTEGRATED PHOTOVOLTAIC ROOF PANEL (BIPV ROOF PANEL) BUILDING-INTEGRATED PHOTOVOLTAIC ROOF PANEL (BIPV ROOF PANEL).
- 202 BUILT-UP ROOF COVERING BUILT-UP ROOF COVERING.
- 202 CANOPY CANOPY.
- 202 CAPACITOR ENERGY STORAGE SYSTEM CAPACITOR ENERGY STORAGE SYSTEM.
- 202 CARBON DIOXIDE EXTINGUISHING SYSTEMS CARBON DIOXIDE EXTINGUISHING SYSTEMS.
- 202 CARBON MONOXIDE ALARM CARBON MONOXIDE ALARM.
- 202 CARBON MONOXIDE DETECTOR CARBON MONOXIDE DETECTOR.
- 202 CARE SUITE CARE SUITE.
- 202 CAST STONE CAST STONE.
- 202 CEILING LIMIT CEILING LIMIT.
- 202 CEILING RADIATION DAMPER CEILING RADIATION DAMPER.
- 202 CELL (Group I-3 occupancy) CELL (Group I-3 occupancy).
- 202 CELL (MASONRY) CELL (MASONRY).
- 202 CELL TIER CELL TIER.
- 202 CEMENT PLASTER CEMENT PLASTER.
- 202 CERAMIC FIBER BLANKET CERAMIC FIBER BLANKET.
- 202 CERTIFICATE OF COMPLIANCE CERTIFICATE OF COMPLIANCE.
- 202 CHANGE OF OCCUPANCY CHANGE OF OCCUPANCY.
- 202 CHIMNEY CHIMNEY.
- 202 FACTORY-BUILT CHIMNEY FACTORY-BUILT CHIMNEY.
- 202 MASONRY CHIMNEY MASONRY CHIMNEY.
- 202 METAL CHIMNEY METAL CHIMNEY.
- 202 CHIMNEY TYPES CHIMNEY TYPES.
- 202 LOW-HEAT APPLIANCE TYPE LOW-HEAT APPLIANCE TYPE.
- 202 MASONRY TYPE MASONRY TYPE.
- 202 MEDIUM-HEAT APPLIANCE TYPE MEDIUM-HEAT APPLIANCE TYPE.
- 202 CIRCULATION PATH CIRCULATION PATH.
- 202 CLEAN AGENT CLEAN AGENT.
- 202 CLIMATE ZONE CLIMATE ZONE.
- 202 CLINIC, OUTPATIENT CLINIC, OUTPATIENT.
- 202 CLOSED SYSTEM CLOSED SYSTEM.
- 202 COASTAL A ZONE COASTAL A ZONE.
- 202 COASTAL HIGH-HAZARD AREA COASTAL HIGH-HAZARD AREA.
- 202 COLLAR JOINT COLLAR JOINT.
- 202 COLLECTOR COLLECTOR.
- 202 COMBINATION FIRE/SMOKE DAMPER COMBINATION FIRE/SMOKE DAMPER.
- 202 COMBINED PILE RAFT COMBINED PILE RAFT.
- 202 COMBUSTIBLE DUST COMBUSTIBLE DUST.
- 202 COMBUSTIBLE FIBERS COMBUSTIBLE FIBERS.
- 202 COMBUSTIBLE LIQUID COMBUSTIBLE LIQUID.
- 202 COMMERCIAL MOTOR VEHICLE COMMERCIAL MOTOR VEHICLE.
- 202 COMMON PATH OF EGRESS TRAVEL COMMON PATH OF EGRESS TRAVEL.
- 202 COMMON USE COMMON USE.
- 202 COMPRESSED GAS COMPRESSED GAS.
- 202 CONCRETE (2) CONCRETE.
- 202 CARBONATE AGGREGATE CARBONATE AGGREGATE.
- 202 CELLULAR CELLULAR.
- 202 LIGHTWEIGHT AGGREGATE LIGHTWEIGHT AGGREGATE.
- 202 PERLITE PERLITE.
- 202 SAND-LIGHTWEIGHT SAND-LIGHTWEIGHT.
- 202 SILICEOUS AGGREGATE SILICEOUS AGGREGATE.
- 202 VERMICULITE VERMICULITE.
- 202 CONGREGATE LIVING FACILITIES CONGREGATE LIVING FACILITIES.
- 202 CONSTANTLY ATTENDED LOCATION CONSTANTLY ATTENDED LOCATION.
- 202 CONSTRUCTION DOCUMENTS CONSTRUCTION DOCUMENTS.
- 202 CONSTRUCTION TYPES CONSTRUCTION TYPES
- 202 CONTINUOUS INSULATION (ci) CONTINUOUS INSULATION (ci).
- 202 CONTROL AREA CONTROL AREA.
- 202 CONTROLLED LOW-STRENGTH MATERIAL CONTROLLED LOW-STRENGTH MATERIAL.
- 202 CONVENTIONAL LIGHT-FRAME CONSTRUCTION CONVENTIONAL LIGHT-FRAME CONSTRUCTION.
- 202 CORNICE CORNICE.
- 202 CORRIDOR CORRIDOR.
- 202 CORRIDOR, OPEN-ENDED CORRIDOR, OPEN-ENDED.
- 202 CORRIDOR DAMPER CORRIDOR DAMPER.
- 202 CORROSION RESISTANCE CORROSION RESISTANCE.
- 202 CORROSIVE CORROSIVE.
- 202 COURT COURT.
- 202 COVERED MALL BUILDING COVERED MALL BUILDING.
- 202 MALL MALL.
- 202 OPEN MALL OPEN MALL.
- 202 OPEN MALL BUILDING OPEN MALL BUILDING.
- 202 CRIPPLE WALL CRIPPLE WALL.
- 202 CRITICAL CIRCUIT CRITICAL CIRCUIT.
- 202 CROSS-LAMINATED TIMBER CROSS-LAMINATED TIMBER.
- 202 CRYOGENIC FLUID CRYOGENIC FLUID.
- 202 CUSTODIAL CARE CUSTODIAL CARE.
- 202 DALLE GLASS DALLE GLASS.
- 202 DAMPER DAMPER.
- 202 DANGEROUS DANGEROUS.
- 202 DAY BOX DAY BOX.
- 202 DEAD LOAD DEAD LOAD.
- 202 DECORATIVE GLASS DECORATIVE GLASS.
- 202 DECORATIVE MATERIALS DECORATIVE MATERIALS.
- 202 DEEP FOUNDATION DEEP FOUNDATION.
- 202 DEFEND-IN-PLACE DEFEND-IN-PLACE.
- 202 DEFERRED SUBMITTAL DEFERRED SUBMITTAL.
- 202 DEFLAGRATION DEFLAGRATION.
- 202 DELAYED-ACTION CLOSER DELAYED-ACTION CLOSER.
- 202 DELUGE SYSTEM DELUGE SYSTEM.
- 202 DESIGN EARTHQUAKE GROUND MOTION DESIGN EARTHQUAKE GROUND MOTION.
- 202 DESIGN FLOOD DESIGN FLOOD.
- 202 DESIGN FLOOD ELEVATION DESIGN FLOOD ELEVATION.
- 202 DESIGN PROFESSIONAL, REGISTERED DESIGN PROFESSIONAL, REGISTERED.
- 202 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE, REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE, REGISTERED.
- 202 DESIGN STRENGTH DESIGN STRENGTH.
- 202 DESIGNATED SEISMIC SYSTEM DESIGNATED SEISMIC SYSTEM.
- 202 DETACHED BUILDING DETACHED BUILDING.
- 202 DETAILED PLAIN CONCRETE STRUCTURAL WALL DETAILED PLAIN CONCRETE STRUCTURAL WALL.
- 202 DETECTABLE WARNING DETECTABLE WARNING.
- 202 DETECTOR, HEAT DETECTOR, HEAT.
- 202 DETONATION DETONATION.
- 202 DETOXIFICATION FACILITIES DETOXIFICATION FACILITIES.
- 202 DIAPHRAGM DIAPHRAGM.
- 202 DIAPHRAGM, BLOCKED DIAPHRAGM, BLOCKED.
- 202 DIAPHRAGM BOUNDARY DIAPHRAGM BOUNDARY.
- 202 DIAPHRAGM CHORD DIAPHRAGM CHORD.
- 202 DIAPHRAGM, UNBLOCKED DIAPHRAGM, UNBLOCKED.
- 202 DIMENSIONS DIMENSIONS.
- 202 NOMINAL NOMINAL.
- 202 SPECIFIED SPECIFIED.
- 202 DIRECT ACCESS DIRECT ACCESS.
- 202 DISPENSING DISPENSING.
- 202 DOOR, BALANCED DOOR, BALANCED.
- 202 DOOR, LOW-ENERGY POWER-OPERATED DOOR, LOW-ENERGY POWER-OPERATED.
- 202 DOOR, POWER-ASSISTED DOOR, POWER-ASSISTED.
- 202 DOOR, POWER-OPERATED DOOR, POWER-OPERATED.
- 202 DOORWAY, EXIT ACCESS DOORWAY, EXIT ACCESS.
- 202 DORMITORY DORMITORY.
- 202 DRAFTSTOP DRAFTSTOP.
- 202 DRAG STRUT DRAG STRUT.
- 202 DRY FLOODPROOFING DRY FLOODPROOFING.
- 202 DRY-CHEMICAL EXTINGUISHING AGENT DRY-CHEMICAL EXTINGUISHING AGENT.
- 202 DWELLING DWELLING.
- 202 DWELLING UNIT DWELLING UNIT.
- 202 DWELLING UNIT, EFFICIENCY DWELLING UNIT, EFFICIENCY.
- 202 DWELLING UNIT OR SLEEPING UNIT, MULTISTORY DWELLING UNIT OR SLEEPING UNIT, MULTISTORY.
- 202 EGRESS COURT EGRESS COURT.
- 202 ELECTRIC VEHICLE CHARGING STATION ELECTRIC VEHICLE CHARGING STATION.
- 202 ELECTRICAL CIRCUIT PROTECTIVE SYSTEM ELECTRICAL CIRCUIT PROTECTIVE SYSTEM.
- 202 ELEVATOR GROUP ELEVATOR GROUP.
- 202 EMERGENCY ALARM SYSTEM EMERGENCY ALARM SYSTEM.
- 202 EMERGENCY CONTROL STATION EMERGENCY CONTROL STATION.
- 202 EMERGENCY ESCAPE AND RESCUE OPENING EMERGENCY ESCAPE AND RESCUE OPENING.
- 202 EMERGENCY POWER SYSTEM EMERGENCY POWER SYSTEM.
- 202 EMERGENCY VOICE/ALARM COMMUNICATIONS EMERGENCY VOICE/ALARM COMMUNICATIONS.
- 202 EMITTANCE EMITTANCE.
- 202 EMPLOYEE WORK AREA EMPLOYEE WORK AREA.
- 202 ENERGY STORAGE SYSTEM, ELECTROCHEMICAL ENERGY STORAGE SYSTEM, ELECTROCHEMICAL.
- 202 ENGINEERED WOOD RIM BOARD ENGINEERED WOOD RIM BOARD.
- 202 ENTRANCE, PUBLIC ENTRANCE, PUBLIC.
- 202 ENTRANCE, RESTRICTED ENTRANCE, RESTRICTED.
- 202 ENTRANCE, SERVICE ENTRANCE, SERVICE.
- 202 EQUIPMENT PLATFORM EQUIPMENT PLATFORM.
- 202 ESSENTIAL FACILITIES ESSENTIAL FACILITIES.
- 202 EXHAUSTED ENCLOSURE EXHAUSTED ENCLOSURE.
- 202 EXISTING BUILDING EXISTING BUILDING.
- 202 EXISTING STRUCTURE EXISTING STRUCTURE.
- 202 EXIT EXIT.
- 202 EXIT, HORIZONTAL EXIT, HORIZONTAL.
- 202 EXIT ACCESS EXIT ACCESS.
- 202 EXIT ACCESS DOORWAY EXIT ACCESS DOORWAY.
- 202 EXIT ACCESS RAMP EXIT ACCESS RAMP.
- 202 EXIT ACCESS STAIRWAY EXIT ACCESS STAIRWAY.
- 202 EXIT DISCHARGE EXIT DISCHARGE.
- 202 EXIT DISCHARGE, LEVEL OF EXIT DISCHARGE, LEVEL OF.
- 202 EXIT PASSAGEWAY EXIT PASSAGEWAY.
- 202 EXPANDED VINYL WALL COVERING EXPANDED VINYL WALL COVERING.
- 202 EXPLOSION EXPLOSION.
- 202 EXPLOSIVE EXPLOSIVE.
- 202 HIGH EXPLOSIVE HIGH EXPLOSIVE.
- 202 LOW EXPLOSIVE LOW EXPLOSIVE.
- 202 MASS-DETONATING EXPLOSIVES MASS-DETONATING EXPLOSIVES.
- 202 UN/DOTn CLASS 1 EXPLOSIVES UN/DOTn CLASS 1 EXPLOSIVES.
- 202 EXTERIOR EXIT RAMP EXTERIOR EXIT RAMP.
- 202 EXTERIOR EXIT STAIRWAY EXTERIOR EXIT STAIRWAY.
- 202 EXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) EXTERIOR INSULATION AND FINISH SYSTEMS (EIFS).
- 202 EXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) WITH DRAINAGE EXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) WITH DRAINAGE.
- 202 EXTERIOR SURFACES EXTERIOR SURFACES.
- 202 EXTERIOR WALL EXTERIOR WALL.
- 202 EXTERIOR WALL COVERING EXTERIOR WALL COVERING.
- 202 EXTERIOR WALL ENVELOPE EXTERIOR WALL ENVELOPE.
- 202 F RATING F RATING.
- 202 FABRIC PARTITION FABRIC PARTITION.
- 202 FABRICATED ITEM FABRICATED ITEM.
- 202 FABRICATION AREA FABRICATION AREA.
- 202 FACILITY FACILITY.
- 202 FACTORED LOAD FACTORED LOAD.
- 202 FENESTRATION FENESTRATION.
- 202 FENESTRATION, VERTICAL FENESTRATION, VERTICAL.
- 202 FIBERBOARD FIBERBOARD.
- 202 FIBER-CEMENT (BACKER BOARD, SIDING, SOFFIT, TRIM AND UNDERLAYMENT) PRODUCTS FIBER-CEMENT (BACKER BOARD, SIDING, SOFFIT, TRIM AND UNDERLAYMENT) PRODUCTS.
- 202 FIBER-REINFORCED POLYMER FIBER-REINFORCED POLYMER
- 202 FIELD NAILING FIELD NAILING.
- 202 FIRE ALARM BOX, MANUAL FIRE ALARM BOX, MANUAL.
- 202 FIRE ALARM CONTROL UNIT FIRE ALARM CONTROL UNIT.
- 202 FIRE ALARM SIGNAL FIRE ALARM SIGNAL.
- 202 FIRE ALARM SYSTEM FIRE ALARM SYSTEM.
- 202 FIRE AREA FIRE AREA.
- 202 FIRE BARRIER FIRE BARRIER.
- 202 FIRE COMMAND CENTER FIRE COMMAND CENTER.
- 202 FIRE DAMPER FIRE DAMPER.
- 202 FIRE DETECTOR, AUTOMATIC FIRE DETECTOR, AUTOMATIC.
- 202 FIRE DOOR FIRE DOOR.
- 202 FIRE DOOR ASSEMBLY FIRE DOOR ASSEMBLY.
- 202 FIRE DOOR ASSEMBLY, FLOOR FIRE DOOR ASSEMBLY, FLOOR.
- 202 FIRE EXIT HARDWARE FIRE EXIT HARDWARE.
- 202 FIRE LANE FIRE LANE.
- 202 FIRE PARTITION FIRE PARTITION.
- 202 FIRE PROTECTION RATING FIRE PROTECTION RATING.
- 202 FIRE PROTECTION SYSTEM FIRE PROTECTION SYSTEM.
- 202 FIRE PROTECTIVE CURTAIN ASSEMBLY FIRE PROTECTIVE CURTAIN ASSEMBLY.
- 202 FIRE RESISTANCE FIRE RESISTANCE.
- 202 FIRE SAFETY FUNCTIONS FIRE SAFETY FUNCTIONS.
- 202 FIRE SEPARATION DISTANCE FIRE SEPARATION DISTANCE.
- 202 FIRE WALL FIRE WALL.
- 202 FIRE WINDOW ASSEMBLY FIRE WINDOW ASSEMBLY.
- 202 FIREBLOCKING FIREBLOCKING.
- 202 FIREPLACE FIREPLACE.
- 202 FIREPLACE THROAT FIREPLACE THROAT.
- 202 FIRE-RATED GLAZING FIRE-RATED GLAZING.
- 202 FIRE-RESISTANCE RATING FIRE-RESISTANCE RATING.
- 202 FIRE-RESISTANT JOINT SYSTEM FIRE-RESISTANT JOINT SYSTEM.
- 202 FIRE-RETARDANT-TREATED WOOD FIRE-RETARDANT-TREATED WOOD
- 202 FIRESTOP, MEMBRANE-PENETRATION FIRESTOP, MEMBRANE-PENETRATION.
- 202 FIRESTOP, PENETRATION FIRESTOP, PENETRATION.
- 202 FIRESTOP SYSTEM, THROUGH-PENETRATION FIRESTOP SYSTEM, THROUGH-PENETRATION.
- 202 FIREWORKS FIREWORKS.
- 202 FIREWORKS, 1.3G FIREWORKS, 1.3G.
- 202 FIREWORKS, 1.4G FIREWORKS, 1.4G.
- 202 FIXED BASE OPERATOR (FBO) FIXED BASE OPERATOR (FBO).
- 202 FIXED SEATING FIXED SEATING.
- 202 FLAME SPREAD FLAME SPREAD.
- 202 FLAME SPREAD INDEX FLAME SPREAD INDEX.
- 202 FLAMMABLE GAS FLAMMABLE GAS.
- 202 FLAMMABLE LIQUEFIED GAS FLAMMABLE LIQUEFIED GAS.
- 202 FLAMMABLE LIQUID FLAMMABLE LIQUID.
- 202 FLAMMABLE MATERIAL FLAMMABLE MATERIAL.
- 202 FLAMMABLE SOLID FLAMMABLE SOLID.
- 202 FLAMMABLE VAPORS OR FUMES FLAMMABLE VAPORS OR FUMES.
- 202 FLASH POINT FLASH POINT.
- 202 FLIGHT FLIGHT.
- 202 FLOOD DAMAGE-RESISTANT MATERIALS FLOOD DAMAGE-RESISTANT MATERIALS.
- 202 FLOOD ELEVATION, DESIGN FLOOD ELEVATION, DESIGN.
- 202 FLOOD HAZARD AREA FLOOD HAZARD AREA.
- 202 FLOOD HAZARD AREAS, SPECIAL FLOOD HAZARD AREAS, SPECIAL.
- 202 FLOOD or FLOODING FLOOD or FLOODING
- 202 FLOODWAY FLOODWAY.
- 202 FLOOR AREA, GROSS FLOOR AREA, GROSS.
- 202 FLOOR AREA, NET FLOOR AREA, NET.
- 202 FLOOR FIRE DOOR ASSEMBLY FLOOR FIRE DOOR ASSEMBLY.
- 202 FOAM PLASTIC INSULATION FOAM PLASTIC INSULATION.
- 202 FOAM-EXTINGUISHING SYSTEM FOAM-EXTINGUISHING SYSTEM.
- 202 FOLDING AND TELESCOPIC SEATING FOLDING AND TELESCOPIC SEATING.
- 202 FOOD COURT FOOD COURT.
- 202 FOSTER CARE FACILITIES FOSTER CARE FACILITIES.
- 202 FOUNDATION PIER FOUNDATION PIER.
- 202 FRAME STRUCTURE FRAME STRUCTURE.
- 202 FUEL CELL POWER SYSTEM, STATIONARY FUEL CELL POWER SYSTEM, STATIONARY.
- 202 GABLE GABLE.
- 202 GAS CABINET GAS CABINET.
- 202 GAS DETECTION SYSTEM GAS DETECTION SYSTEM.
- 202 GAS ROOM GAS ROOM.
- 202 GASEOUS HYDROGEN SYSTEM GASEOUS HYDROGEN SYSTEM.
- 202 GLASS FIBERBOARD GLASS FIBERBOARD.
- 202 GLASS MAT GYPSUM PANEL GLASS MAT GYPSUM PANEL.
- 202 GRADE (LUMBER) GRADE (LUMBER).
- 202 GRADE FLOOR EMERGENCY ESCAPE AND RESCUE OPENING GRADE FLOOR EMERGENCY ESCAPE AND RESCUE OPENING.
- 202 GRADE PLANE GRADE PLANE.
- 202 GRADE PLANE, STORY ABOVE GRADE PLANE, STORY ABOVE.
- 202 GRANDSTAND GRANDSTAND.
- 202 GREENHOUSE GREENHOUSE.
- 202 GROSS LEASABLE AREA GROSS LEASABLE AREA.
- 202 GROUP HOME GROUP HOME.
- 202 GUARD GUARD.
- 202 GUEST ROOM GUEST ROOM.
- 202 GYPSUM BOARD GYPSUM BOARD.
- 202 GYPSUM PANEL PRODUCT GYPSUM PANEL PRODUCT.
- 202 GYPSUM PLASTER GYPSUM PLASTER.
- 202 GYPSUM SHEATHING GYPSUM SHEATHING.
- 202 GYPSUM VENEER PLASTER GYPSUM VENEER PLASTER.
- 202 GYPSUM WALLBOARD GYPSUM WALLBOARD.
- 202 HABITABLE SPACE HABITABLE SPACE.
- 202 HALOGENATED EXTINGUISHING SYSTEM HALOGENATED EXTINGUISHING SYSTEM.
- 202 HANDLING HANDLING.
- 202 HANDRAIL HANDRAIL.
- 202 HARDBOARD HARDBOARD.
- 202 HARDWARE HARDWARE.
- 202 HAZARDOUS MATERIALS HAZARDOUS MATERIALS.
- 202 HAZARDOUS PRODUCTION MATERIAL (HPM) HAZARDOUS PRODUCTION MATERIAL (HPM).
- 202 HEAD JOINT HEAD JOINT.
- 202 HEALTH HAZARD HEALTH HAZARD.
- 202 HEAT DETECTOR HEAT DETECTOR.
- 202 HEIGHT, BUILDING HEIGHT, BUILDING.
- 202 HELICAL PILE HELICAL PILE.
- 202 HELIPAD HELIPAD.
- 202 HELIPORT HELIPORT.
- 202 HELISTOP HELISTOP.
- 202 HIGHER EDUCATION LABORATORY HIGHER EDUCATION LABORATORY
- 202 HIGHLY TOXIC HIGHLY TOXIC.
- 202 HIGH-PRESSURE DECORATIVE EXTERIOR-GRADE COMPACT LAMINATE (HPL) HIGH-PRESSURE DECORATIVE EXTERIOR-GRADE COMPACT LAMINATE (HPL).
- 202 HIGH-PRESSURE DECORATIVE EXTERIOR-GRADE COMPACT LAMINATE (HPL) SYSTEM HIGH-PRESSURE DECORATIVE EXTERIOR-GRADE COMPACT LAMINATE (HPL) SYSTEM.
- 202 HIGH-RISE BUILDING HIGH-RISE BUILDING.
- 202 HISTORIC BUILDINGS HISTORIC BUILDINGS.
- 202 HORIZONTAL ASSEMBLY HORIZONTAL ASSEMBLY.
- 202 HORIZONTAL EXIT HORIZONTAL EXIT.
- 202 HOSPITALS AND PSYCHIATRIC HOSPITALS HOSPITALS AND PSYCHIATRIC HOSPITALS.
- 202 HOUSING UNIT HOUSING UNIT.
- 202 HPM HPM.
- 202 HPM ROOM HPM ROOM.
- 202 HYDROGEN FUEL GAS ROOM HYDROGEN FUEL GAS ROOM.
- 202 IMMEDIATELY DANGEROUS TO LIFE AND HEALTH (IDLH) IMMEDIATELY DANGEROUS TO LIFE AND HEALTH (IDLH).
- 202 IMPACT LOAD IMPACT LOAD.
- 202 IMPACT PROTECTIVE SYSTEM IMPACT PROTECTIVE SYSTEM.
- 202 INCAPABLE OF SELF-PRESERVATION INCAPABLE OF SELF-PRESERVATION.
- 202 INCOMPATIBLE MATERIALS INCOMPATIBLE MATERIALS.
- 202 INDIVIDUAL TRUSS MEMBER INDIVIDUAL TRUSS MEMBER.
- 202 INERT GAS INERT GAS.
- 202 INITIATING DEVICE INITIATING DEVICE.
- 202 INSULATING SHEATHING INSULATING SHEATHING.
- 202 INTENDED TO BE OCCUPIED AS A RESIDENCE INTENDED TO BE OCCUPIED AS A RESIDENCE.
- 202 INTERIOR EXIT RAMP INTERIOR EXIT RAMP.
- 202 INTERIOR EXIT STAIRWAY INTERIOR EXIT STAIRWAY.
- 202 INTERIOR FINISH INTERIOR FINISH.
- 202 INTERIOR FLOOR FINISH INTERIOR FLOOR FINISH.
- 202 INTERIOR FLOOR-WALL BASE INTERIOR FLOOR-WALL BASE.
- 202 INTERIOR SURFACES INTERIOR SURFACES.
- 202 INTERIOR WALL AND CEILING FINISH INTERIOR WALL AND CEILING FINISH.
- 202 INTERLAYMENT INTERLAYMENT.
- 202 INTERMODAL SHIPPING CONTAINER INTERMODAL SHIPPING CONTAINER.
- 202 INTUMESCENT FIRE-RESISTANT COATINGS INTUMESCENT FIRE-RESISTANT COATINGS.
- 202 JOINT JOINT.
- 202 JURISDICTION JURISDICTION.
- 202 L RATING L RATING.
- 202 LABEL LABEL.
- 202 LABELED LABELED.
- 202 LABORATORY SUITE LABORATORY SUITE.
- 202 LEVEL OF EXIT DISCHARGE LEVEL OF EXIT DISCHARGE.
- 202 LIFE SAFETY SYSTEMS LIFE SAFETY SYSTEMS
- 202 LIGHT-DIFFUSING SYSTEM LIGHT-DIFFUSING SYSTEM.
- 202 LIGHT-FRAME CONSTRUCTION LIGHT-FRAME CONSTRUCTION.
- 202 LIGHT-TRANSMITTING PLASTIC ROOF PANELS LIGHT-TRANSMITTING PLASTIC ROOF PANELS.
- 202 LIGHT-TRANSMITTING PLASTIC WALL PANELS LIGHT-TRANSMITTING PLASTIC WALL PANELS.
- 202 LIMIT OF MODERATE WAVE ACTION LIMIT OF MODERATE WAVE ACTION.
- 202 LIMIT STATE LIMIT STATE.
- 202 LIQUID LIQUID.
- 202 LIQUID STORAGE ROOM LIQUID STORAGE ROOM.
- 202 LIQUID USE, DISPENSING AND MIXING ROOM LIQUID USE, DISPENSING AND MIXING ROOM.
- 202 LISTED LISTED.
- 202 LIVE LOAD LIVE LOAD.
- 202 LIVE LOAD, ROOF LIVE LOAD, ROOF.
- 202 LIVE/WORK UNIT LIVE/WORK UNIT
- 202 LOAD AND RESISTANCE FACTOR DESIGN (LRFD) LOAD AND RESISTANCE FACTOR DESIGN (LRFD).
- 202 LOAD EFFECTS LOAD EFFECTS.
- 202 LOAD FACTOR LOAD FACTOR.
- 202 LOADS LOADS.
- 202 LODGING HOUSE LODGING HOUSE.
- 202 LOT LOT.
- 202 LOT LINE LOT LINE.
- 202 LOW-ENERGY POWER-OPERATED DOOR LOW-ENERGY POWER-OPERATED DOOR.
- 202 LOWER FLAMMABLE LIMIT (LFL) LOWER FLAMMABLE LIMIT (LFL).
- 202 LOWEST FLOOR LOWEST FLOOR.
- 202 MAIN WINDFORCE-RESISTING SYSTEM MAIN WINDFORCE-RESISTING SYSTEM.
- 202 MALL BUILDING, COVERED and MALL BUILDING, OPEN MALL BUILDING, COVERED and MALL BUILDING, OPEN.
- 202 MANUAL FIRE ALARM BOX MANUAL FIRE ALARM BOX.
- 202 MANUFACTURER’S DESIGNATION MANUFACTURER’S DESIGNATION.
- 202 MARK MARK.
- 202 MARQUEE MARQUEE.
- 202 MASONRY MASONRY.
- 202 GLASS UNIT MASONRY GLASS UNIT MASONRY.
- 202 PLAIN MASONRY PLAIN MASONRY.
- 202 REINFORCED MASONRY REINFORCED MASONRY.
- 202 SOLID MASONRY SOLID MASONRY.
- 202 UNREINFORCED (PLAIN) MASONRY UNREINFORCED (PLAIN) MASONRY.
- 202 MASONRY UNIT MASONRY UNIT.
- 202 HOLLOW HOLLOW.
- 202 SOLID SOLID.
- 202 MASS TIMBER MASS TIMBER.
- 202 MASTIC FIRE-RESISTANT COATINGS MASTIC FIRE-RESISTANT COATINGS.
- 202 MEANS OF EGRESS MEANS OF EGRESS.
- 202 MECHANICAL EQUIPMENT SCREEN MECHANICAL EQUIPMENT SCREEN.
- 202 MECHANICAL-ACCESS ENCLOSED PARKING GARAGE MECHANICAL-ACCESS ENCLOSED PARKING GARAGE.
- 202 MECHANICAL-ACCESS OPEN PARKING GARAGES MECHANICAL-ACCESS OPEN PARKING GARAGES.
- 202 MEDICAL CARE MEDICAL CARE.
- 202 MEMBRANE PENETRATION MEMBRANE PENETRATION.
- 202 MEMBRANE-COVERED CABLE STRUCTURE MEMBRANE-COVERED CABLE STRUCTURE.
- 202 MEMBRANE-COVERED FRAME STRUCTURE MEMBRANE-COVERED FRAME STRUCTURE.
- 202 MEMBRANE-PENETRATION FIRESTOP MEMBRANE-PENETRATION FIRESTOP.
- 202 MEMBRANE-PENETRATION FIRESTOP SYSTEM MEMBRANE-PENETRATION FIRESTOP SYSTEM.
- 202 MERCHANDISE PAD MERCHANDISE PAD.
- 202 METAL COMPOSITE MATERIAL (MCM) METAL COMPOSITE MATERIAL (MCM).
- 202 METAL COMPOSITE MATERIAL (MCM) SYSTEM METAL COMPOSITE MATERIAL (MCM) SYSTEM.
- 202 METAL ROOF PANEL METAL ROOF PANEL.
- 202 METAL ROOF SHINGLE METAL ROOF SHINGLE.
- 202 MEZZANINE MEZZANINE.
- 202 MINERAL BOARD MINERAL BOARD.
- 202 MINERAL FIBER MINERAL FIBER.
- 202 MINERAL WOOL MINERAL WOOL.
- 202 MODIFIED BITUMEN ROOF COVERING MODIFIED BITUMEN ROOF COVERING.
- 202 MORTAR MORTAR.
- 202 MORTAR, SURFACE-BONDING MORTAR, SURFACE-BONDING.
- 202 MULTILEVEL ASSEMBLY SEATING MULTILEVEL ASSEMBLY SEATING.
- 202 MULTIPLE-STATION ALARM DEVICE MULTIPLE-STATION ALARM DEVICE.
- 202 MULTIPLE-STATION SMOKE ALARM MULTIPLE-STATION SMOKE ALARM.
- 202 MULTISTORY UNIT MULTISTORY UNIT.
- 202 NAILING, BOUNDARY NAILING, BOUNDARY.
- 202 NAILING, EDGE NAILING, EDGE.
- 202 NAILING, FIELD NAILING, FIELD.
- 202 NATURALLY DURABLE WOOD NATURALLY DURABLE WOOD.
- 202 DECAY RESISTANT DECAY RESISTANT.
- 202 TERMITE RESISTANT TERMITE RESISTANT.
- 202 NOMINAL LOADS NOMINAL LOADS.
- 202 NOMINAL SIZE (LUMBER) NOMINAL SIZE (LUMBER).
- 202 NONCOMBUSTIBLE MEMBRANE STRUCTURE NONCOMBUSTIBLE MEMBRANE STRUCTURE.
- 202 NONCOMBUSTIBLE PROTECTION (FOR MASS TIMBER) NONCOMBUSTIBLE PROTECTION (FOR MASS TIMBER).
- 202 NONSTRUCTURAL CONCRETE NONSTRUCTURAL CONCRETE.
- 202 NORMAL TEMPERATURE AND PRESSURE (NTP) NORMAL TEMPERATURE AND PRESSURE (NTP).
- 202 NOSING NOSING.
- 202 NOTIFICATION ZONE NOTIFICATION ZONE.
- 202 NUISANCE ALARM NUISANCE ALARM.
- 202 NURSING HOMES NURSING HOMES.
- 202 OCCUPANT LOAD OCCUPANT LOAD.
- 202 OCCUPIABLE SPACE OCCUPIABLE SPACE.
- 202 OPEN PARKING GARAGE OPEN PARKING GARAGE.
- 202 OPEN SYSTEM OPEN SYSTEM.
- 202 OPEN-AIR ASSEMBLY SEATING OPEN-AIR ASSEMBLY SEATING.
- 202 OPEN-ENDED CORRIDOR OPEN-ENDED CORRIDOR
- 202 OPENING PROTECTIVE OPENING PROTECTIVE.
- 202 OPERATING BUILDING OPERATING BUILDING.
- 202 ORGANIC PEROXIDE ORGANIC PEROXIDE.
- 202 Construction and Demolition Waste (CDW) Construction and Demolition Waste (CDW):
- 202 Construction and Demolition Waste Management Plan Construction and Demolition Waste Management Plan:
- 202 UNCLASSIFIED DETONABLE UNCLASSIFIED DETONABLE.
- 202 ORTHOGONAL ORTHOGONAL.
- 202 OUTPATIENT CLINIC OUTPATIENT CLINIC.
- 202 OWNER OWNER.
- 202 OXIDIZER OXIDIZER.
- 202 OXIDIZING GAS OXIDIZING GAS.
- 202 PANEL (PART OF A STRUCTURE) PANEL (PART OF A STRUCTURE).
- 202 PANIC HARDWARE PANIC HARDWARE.
- 202 PARTICLEBOARD PARTICLEBOARD.
- 202 PENETRATION FIRESTOP PENETRATION FIRESTOP.
- 202 PENTHOUSE PENTHOUSE.
- 202 PERFORMANCE CATEGORY PERFORMANCE CATEGORY.
- 202 PERIMETER FIRE CONTAINMENT SYSTEM PERIMETER FIRE CONTAINMENT SYSTEM.
- 202 PERMANENT INDIVIDUAL TRUSS MEMBER DIAGONAL BRACING (PITMDB) PERMANENT INDIVIDUAL TRUSS MEMBER DIAGONAL BRACING (PITMDB).
- 202 PERMANENT INDIVIDUAL TRUSS MEMBER RESTRAINT (PITMR) PERMANENT INDIVIDUAL TRUSS MEMBER RESTRAINT (PITMR).
- 202 PERMIT PERMIT.
- 202 PERSON PERSON.
- 202 PERSONAL CARE SERVICE PERSONAL CARE SERVICE.
- 202 PHOTOLUMINESCENT PHOTOLUMINESCENT.
- 202 PHOTOVOLTAIC MODULE PHOTOVOLTAIC MODULE.
- 202 PHOTOVOLTAIC PANEL PHOTOVOLTAIC PANEL.
- 202 PHOTOVOLTAIC PANEL SYSTEM PHOTOVOLTAIC PANEL SYSTEM.
- 202 PHOTOVOLTAIC SHINGLES PHOTOVOLTAIC SHINGLES.
- 202 PHYSICAL HAZARD PHYSICAL HAZARD.
- 202 PHYSIOLOGICAL WARNING THRESHOLD LEVEL PHYSIOLOGICAL WARNING THRESHOLD LEVEL.
- 202 PLASTIC COMPOSITE PLASTIC COMPOSITE.
- 202 PLASTIC GLAZING PLASTIC GLAZING.
- 202 PLASTIC LUMBER PLASTIC LUMBER.
- 202 PLATFORM PLATFORM.
- 202 PLAY STRUCTURE PLAY STRUCTURE.
- 202 POLYPROPYLENE SIDING POLYPROPYLENE SIDING.
- 202 PORCELAIN TILE PORCELAIN TILE.
- 202 POSITIVE ROOF DRAINAGE POSITIVE ROOF DRAINAGE.
- 202 POWER-ASSISTED DOOR POWER-ASSISTED DOOR.
- 202 POWER-OPERATED DOOR POWER-OPERATED DOOR.
- 202 PREFABRICATED WOOD I-JOIST PREFABRICATED WOOD I-JOIST.
- 202 PRESERVATIVE-TREATED WOOD PRESERVATIVE-TREATED WOOD.
- 202 PRESTRESSED MASONRY PRESTRESSED MASONRY.
- 202 PRIMARY STRUCTURAL FRAME PRIMARY STRUCTURAL FRAME.
- 202 PRIVATE GARAGE PRIVATE GARAGE.
- 202 PROSCENIUM WALL PROSCENIUM WALL.
- 202 PSYCHIATRIC HOSPITALS PSYCHIATRIC HOSPITALS.
- 202 PUBLIC ENTRANCE PUBLIC ENTRANCE.
- 202 PUBLIC WAY PUBLIC WAY.
- 202 PUBLIC-USE AREAS PUBLIC-USE AREAS.
- 202 PUZZLE ROOM PUZZLE ROOM.
- 202 PYROPHORIC PYROPHORIC.
- 202 PYROTECHNIC COMPOSITION PYROTECHNIC COMPOSITION.
- 202 RADIANT BARRIER RADIANT BARRIER.
- 202 RAMP RAMP.
- 202 RAMP, EXIT ACCESS RAMP, EXIT ACCESS.
- 202 RAMP, EXTERIOR EXIT RAMP, EXTERIOR EXIT.
- 202 RAMP, INTERIOR EXIT RAMP, INTERIOR EXIT.
- 202 RAMP-ACCESS OPEN PARKING GARAGES RAMP-ACCESS OPEN PARKING GARAGES.
- 202 RECORD DRAWINGS RECORD DRAWINGS.
- 202 Recycled Aggregates Recycled Aggregates:
- 202 REFLECTIVE PLASTIC CORE INSULATION REFLECTIVE PLASTIC CORE INSULATION.
- 202 REGISTERED DESIGN PROFESSIONAL REGISTERED DESIGN PROFESSIONAL.
- 202 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE.
- 202 RELIGIOUS WORSHIP, PLACE OF RELIGIOUS WORSHIP, PLACE OF
- 202 RELOCATABLE BUILDING RELOCATABLE BUILDING.
- 202 REPAIR REPAIR.
- 202 REPAIR GARAGE REPAIR GARAGE.
- 202 REROOFING REROOFING.
- 202 RESIDENTIAL AIRCRAFT HANGAR RESIDENTIAL AIRCRAFT HANGAR.
- 202 RESISTANCE FACTOR RESISTANCE FACTOR.
- 202 RESTRICTED ENTRANCE RESTRICTED ENTRANCE.
- 202 RETRACTABLE AWNING RETRACTABLE AWNING.
- 202 RISK CATEGORY RISK CATEGORY.
- 202 RISK-TARGETED MAXIMUM CONSIDERED EARTHQUAKE (MCER) GROUND MOTION RESPONSE ACCELERATIONS RISK-TARGETED MAXIMUM CONSIDERED EARTHQUAKE (MCER) GROUND MOTION RESPONSE ACCELERATIONS.
- 202 ROOF ASSEMBLY (For application to Chapter 15 only) ROOF ASSEMBLY (For application to Chapter 15 only).
- 202 ROOF COATING ROOF COATING.
- 202 ROOF COVERING ROOF COVERING.
- 202 ROOF COVERING SYSTEM ROOF COVERING SYSTEM.
- 202 ROOF DECK ROOF DECK.
- 202 ROOF DRAINAGE, POSITIVE ROOF DRAINAGE, POSITIVE.
- 202 ROOF RECOVER ROOF RECOVER.
- 202 ROOF REPAIR ROOF REPAIR.
- 202 ROOF REPLACEMENT ROOF REPLACEMENT.
- 202 ROOF VENTILATION ROOF VENTILATION.
- 202 ROOFTOP STRUCTURE ROOFTOP STRUCTURE.
- 202 RUNNING BOND RUNNING BOND.
- 202 SALLYPORT SALLYPORT.
- 202 SCISSOR STAIRWAY SCISSOR STAIRWAY.
- 202 SCUPPER SCUPPER.
- 202 SECONDARY STRUCTURAL MEMBERS SECONDARY STRUCTURAL MEMBERS.
- 202 SEISMIC DESIGN CATEGORY SEISMIC DESIGN CATEGORY.
- 202 SEISMIC FORCE-RESISTING SYSTEM SEISMIC FORCE-RESISTING SYSTEM.
- 202 SELF-CLOSING SELF-CLOSING.
- 202 SELF-LUMINOUS SELF-LUMINOUS.
- 202 SELF-PRESERVATION, INCAPABLE OF SELF-PRESERVATION, INCAPABLE OF.
- 202 SELF-SERVICE STORAGE FACILITY SELF-SERVICE STORAGE FACILITY.
- 202 SERVICE CORRIDOR SERVICE CORRIDOR.
- 202 SERVICE ENTRANCE SERVICE ENTRANCE.
- 202 SHAFT SHAFT.
- 202 SHAFT ENCLOSURE SHAFT ENCLOSURE.
- 202 SHALLOW FOUNDATION SHALLOW FOUNDATION.
- 202 SHEAR WALL SHEAR WALL.
- 202 SHEAR WALL, PERFORATED SHEAR WALL, PERFORATED.
- 202 SHEAR WALL SEGMENT, PERFORATED SHEAR WALL SEGMENT, PERFORATED.
- 202 SHINGLE FASHION SHINGLE FASHION.
- 202 SINGLE-PLY MEMBRANE SINGLE-PLY MEMBRANE.
- 202 SINGLE-STATION SMOKE ALARM SINGLE-STATION SMOKE ALARM.
- 202 SITE SITE.
- 202 SITE CLASS SITE CLASS.
- 202 SITE COEFFICIENTS SITE COEFFICIENTS.
- 202 SITE-FABRICATED STRETCH SYSTEM SITE-FABRICATED STRETCH SYSTEM.
- 202 SKYLIGHT, UNIT SKYLIGHT, UNIT.
- 202 SKYLIGHTS AND SLOPED GLAZING SKYLIGHTS AND SLOPED GLAZING.
- 202 SLEEPING UNIT SLEEPING UNIT.
- 202 SMOKE ALARM SMOKE ALARM.
- 202 SMOKE BARRIER SMOKE BARRIER.
- 202 SMOKE COMPARTMENT SMOKE COMPARTMENT.
- 202 SMOKE DAMPER SMOKE DAMPER.
- 202 SMOKE DETECTOR SMOKE DETECTOR.
- 202 SMOKE PARTITION SMOKE PARTITION.
- 202 SMOKE-DEVELOPED INDEX SMOKE-DEVELOPED INDEX.
- 202 SMOKEPROOF ENCLOSURE SMOKEPROOF ENCLOSURE.
- 202 SMOKE-PROTECTED ASSEMBLY SEATING SMOKE-PROTECTED ASSEMBLY SEATING
- 202 SOFT CONTAINED PLAY EQUIPMENT STRUCTURE SOFT CONTAINED PLAY EQUIPMENT STRUCTURE.
- 202 SOLID (2) SOLID.
- 202 SPECIAL AMUSEMENT BUILDING SPECIAL AMUSEMENT BUILDING.
- 202 SPECIAL EVENT STRUCTURE SPECIAL EVENT STRUCTURE.
- 202 SPECIAL FLOOD HAZARD AREA SPECIAL FLOOD HAZARD AREA.
- 202 SPECIAL INSPECTION SPECIAL INSPECTION.
- 202 CONTINUOUS SPECIAL INSPECTION CONTINUOUS SPECIAL INSPECTION.
- 202 PERIODIC SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION.
- 202 SPECIAL INSPECTOR SPECIAL INSPECTOR.
- 202 SPECIFIED COMPRESSIVE STRENGTH OF MASONRY, f´m SPECIFIED COMPRESSIVE STRENGTH OF MASONRY, f´m.
- 202 SPLICE SPLICE.
- 202 SPORT ACTIVITY, AREA OF SPORT ACTIVITY, AREA OF.
- 202 SPRAY ROOM SPRAY ROOM.
- 202 SPRAY-APPLIED FOAM PLASTIC SPRAY-APPLIED FOAM PLASTIC.
- 202 SPRAYED FIRE-RESISTANT MATERIALS SPRAYED FIRE-RESISTANT MATERIALS.
- 202 STAGE STAGE.
- 202 STAIR STAIR.
- 202 STAIRWAY STAIRWAY.
- 202 STAIRWAY, EXIT ACCESS STAIRWAY, EXIT ACCESS.
- 202 STAIRWAY, EXTERIOR EXIT STAIRWAY, EXTERIOR EXIT.
- 202 STAIRWAY, INTERIOR EXIT STAIRWAY, INTERIOR EXIT.
- 202 STAIRWAY, SCISSOR STAIRWAY, SCISSOR.
- 202 STAIRWAY, SPIRAL STAIRWAY, SPIRAL.
- 202 STANDBY POWER SYSTEM STANDBY POWER SYSTEM.
- 202 STANDPIPE, TYPES OF STANDPIPE, TYPES OF.
- 202 AUTOMATIC DRY AUTOMATIC DRY.
- 202 AUTOMATIC WET AUTOMATIC WET.
- 202 MANUAL DRY MANUAL DRY.
- 202 MANUAL WET MANUAL WET.
- 202 SEMIAUTOMATIC DRY SEMIAUTOMATIC DRY.
- 202 STANDPIPE SYSTEM, CLASSES OF STANDPIPE SYSTEM, CLASSES OF.
- 202 CLASS I SYSTEM CLASS I SYSTEM.
- 202 CLASS II SYSTEM CLASS II SYSTEM.
- 202 STEEL CONSTRUCTION, COLD-FORMED STEEL CONSTRUCTION, COLD-FORMED.
- 202 STEEL ELEMENT, STRUCTURAL STEEL ELEMENT, STRUCTURAL
- 202 STEEL JOIST STEEL JOIST.
- 202 STEEP SLOPE STEEP SLOPE.
- 202 STONE MASONRY STONE MASONRY.
- 202 STORAGE, HAZARDOUS MATERIALS STORAGE, HAZARDOUS MATERIALS.
- 202 STORAGE RACKS, STEEL STORAGE RACKS, STEEL.
- 202 STORAGE RACKS, STEEL CANTILEVERED STORAGE RACKS, STEEL CANTILEVERED.
- 202 STORM SHELTER STORM SHELTER.
- 202 COMMUNITY STORM SHELTER COMMUNITY STORM SHELTER.
- 202 RESIDENTIAL STORM SHELTER RESIDENTIAL STORM SHELTER.
- 202 STORY STORY.
- 202 STORY ABOVE GRADE PLANE STORY ABOVE GRADE PLANE.
- 202 STRENGTH STRENGTH.
- 202 NOMINAL STRENGTH NOMINAL STRENGTH.
- 202 REQUIRED STRENGTH REQUIRED STRENGTH.
- 202 STRENGTH DESIGN STRENGTH DESIGN.
- 202 STRUCTURAL COMPOSITE LUMBER STRUCTURAL COMPOSITE LUMBER.
- 202 LAMINATED STRAND LUMBER (LSL) LAMINATED STRAND LUMBER (LSL).
- 202 LAMINATED VENEER LUMBER (LVL) LAMINATED VENEER LUMBER (LVL).
- 202 ORIENTED STRAND LUMBER (OSL) ORIENTED STRAND LUMBER (OSL).
- 202 PARALLEL STRAND LUMBER (PSL) PARALLEL STRAND LUMBER (PSL).
- 202 STRUCTURAL GLUED-LAMINATED TIMBER STRUCTURAL GLUED-LAMINATED TIMBER.
- 202 STRUCTURAL OBSERVATION STRUCTURAL OBSERVATION.
- 202 STRUCTURE STRUCTURE.
- 202 SUBSTANTIAL DAMAGE SUBSTANTIAL DAMAGE.
- 202 SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT.
- 202 SUNROOM SUNROOM.
- 202 SUPERVISING STATION SUPERVISING STATION.
- 202 SUPERVISORY SERVICE SUPERVISORY SERVICE.
- 202 SUPERVISORY SIGNAL SUPERVISORY SIGNAL.
- 202 SUPERVISORY SIGNAL-INITIATING DEVICE SUPERVISORY SIGNAL-INITIATING DEVICE.
- 202 SUSCEPTIBLE BAY SUSCEPTIBLE BAY.
- 202 SWIMMING POOL SWIMMING POOL.
- 202 T RATING T RATING.
- 202 TECHNICAL PRODUCTION AREA TECHNICAL PRODUCTION AREA.
- 202 TENSILE MEMBRANE STRUCTURE TENSILE MEMBRANE STRUCTURE.
- 202 TENT TENT.
- 202 TERMINATED STOPS TERMINATED STOPS.
- 202 THERMAL ISOLATION THERMAL ISOLATION.
- 202 THERMOPLASTIC MATERIAL THERMOPLASTIC MATERIAL.
- 202 THERMOSETTING MATERIAL THERMOSETTING MATERIAL.
- 202 THROUGH PENETRATION THROUGH PENETRATION.
- 202 THROUGH-PENETRATION FIRESTOP SYSTEM THROUGH-PENETRATION FIRESTOP SYSTEM.
- 202 TIE, WALL TIE, WALL.
- 202 TIE-DOWN (HOLD-DOWN) TIE-DOWN (HOLD-DOWN).
- 202 TILE, STRUCTURAL CLAY TILE, STRUCTURAL CLAY.
- 202 TIRES, BULK STORAGE OF TIRES, BULK STORAGE OF.
- 202 TOWNHOUSE TOWNHOUSE.
- 202 TOXIC TOXIC.
- 202 TRANSIENT TRANSIENT.
- 202 TRANSIENT AIRCRAFT TRANSIENT AIRCRAFT.
- 202 TREATED WOOD TREATED WOOD.
- 202 TRIM TRIM.
- 202 TROUBLE SIGNAL TROUBLE SIGNAL.
- 202 TUBULAR DAYLIGHTING DEVICE (TDD) TUBULAR DAYLIGHTING DEVICE (TDD).
- 202 TYPE A UNIT TYPE A UNIT.
- 202 TYPE B UNIT TYPE B UNIT.
- 202 UMBRELLA STRUCTURE UMBRELLA STRUCTURE.
- 202 UNDERLAYMENT UNDERLAYMENT.
- 202 UNIT SKYLIGHT UNIT SKYLIGHT.
- 202 UNSTABLE (REACTIVE) MATERIAL UNSTABLE (REACTIVE) MATERIAL.
- 202 USE (MATERIAL) USE (MATERIAL).
- 202 VAPOR DIFFUSION PORT VAPOR DIFFUSION PORT.
- 202 VAPOR PERMEABLE VAPOR PERMEABLE.
- 202 VAPOR RETARDER CLASS VAPOR RETARDER CLASS.
- 202 VEGETATIVE ROOF VEGETATIVE ROOF.
- 202 VEHICLE BARRIER VEHICLE BARRIER.
- 202 VEHICULAR GATE VEHICULAR GATE.
- 202 VENEER VENEER.
- 202 VENTILATION VENTILATION.
- 202 VINYL SIDING VINYL SIDING.
- 202 VISIBLE ALARM NOTIFICATION APPLIANCE VISIBLE ALARM NOTIFICATION APPLIANCE.
- 202 WALKWAY, PEDESTRIAN WALKWAY, PEDESTRIAN.
- 202 WALL WALL
- 202 CAVITY WALL CAVITY WALL.
- 202 DRY-STACKED, SURFACE-BONDED WALL DRY-STACKED, SURFACE-BONDED WALL.
- 202 PARAPET WALL PARAPET WALL.
- 202 WALL, LOAD-BEARING WALL, LOAD-BEARING.
- 202 WALL, NONLOAD-BEARING WALL, NONLOAD-BEARING.
- 202 WATER-REACTIVE MATERIAL WATER-REACTIVE MATERIAL.
- 202 WATER-RESISTIVE BARRIER WATER-RESISTIVE BARRIER.
- 202 WEATHER-EXPOSED SURFACES WEATHER-EXPOSED SURFACES.
- 202 WET-CHEMICAL EXTINGUISHING SYSTEM WET-CHEMICAL EXTINGUISHING SYSTEM.
- 202 WHEELCHAIR SPACE WHEELCHAIR SPACE.
- 202 WIND SPEED, V WIND SPEED, V
- 202 WIND SPEED, V (2) WIND SPEED, V
- 202 WIND-BORNE DEBRIS REGION WIND-BORNE DEBRIS REGION.
- 202 WINDER WINDER.
- 202 WIND FORCE-RESISTING SYSTEM, MAIN WIND FORCE-RESISTING SYSTEM, MAIN.
- 202 WIRE BACKING WIRE BACKING.
- 202 WIRELESS PROTECTION SYSTEM WIRELESS PROTECTION SYSTEM.
- 202 WOOD SHEAR PANEL WOOD SHEAR PANEL.
- 202 WOOD STRUCTURAL PANEL WOOD STRUCTURAL PANEL.
- 202 COMPOSITE PANELS COMPOSITE PANELS.
- 202 ORIENTED STRAND BOARD (OSB) ORIENTED STRAND BOARD (OSB).
- 202 PLYWOOD PLYWOOD.
- 202 WOOD/PLASTIC COMPOSITE WOOD/PLASTIC COMPOSITE.
- 202 WORKSTATION WORKSTATION.
- 202 WYTHE WYTHE.
- 202 YARD YARD.
- 202 ZONE ZONE.
- 202 ZONE, NOTIFICATION ZONE, NOTIFICATION.