1709.1 General.
SBC 201 · Edition 2024 · p. 543
Where proposed construction is not capable of being designed by approved engineering analysis, or where proposed construction design method does not comply with the applicable material design standard, the system of construction or the structural unit and the connections shall…
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause