العربيةSign inSign up free

1705.2.2 Cold-formed steel deck.

SBC 201 · Edition 2024 · p. 535

Special inspections and qualification of welding special inspectors for cold-formed steel floor and roof deck shall be in accordance with the quality assurance inspection requirements of SDI QA/QC.

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 201 1705.2.2: Cold-formed steel deck. | Emtithal