110.3.4 Frame inspection.
SBC 201 · Edition 2024 · p. 37
Framing inspections shall be made for each floor and vertical elements prior to the placement of subsequent floors and the pipes, chimneys and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts are…
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause