110.3.11 Exception
SBC 201 · Edition 2024 · p. 38
Backfilling of ground-source heat pump loop systems tested in accordance with Section 2105.1 in SBC 1101/1102 prior to inspection shall be permitted.
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause