العربيةSign inSign up free

106.1 Live loads posted.

SBC 201 · Edition 2024 · p. 34

In commercial or industrial buildings, for each floor or portion thereof designed for live loads exceeding 2.50 kN/m2, such design live loads shall be conspicuously posted by the owner or the owner’s authorized agent in that part of each story…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 201 106.1: Live loads posted. | Emtithal