العربيةSign inSign up free

307.2.5 Plastering:

SBC 1401 · Edition 2024 · p. 42

Plastering of permanently installed concrete swimming pools and spas shall comply with the requirements of (APSP/NPC/ICC-12).

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 1401 307.2.5: Plastering: | Emtithal