111.8 Post-Evaluation and Inspection Services:
SBC 1401 · Edition 2024 · p. 23
Prior to approving a prefabricated closed system and issuing a permit, the code official shall require the submittal of an evaluation report for each prefabricated system indicating the full details of the system, including a description of the system and…
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause