العربيةSign inSign up free

111.6 Approval Required:

SBC 1401 · Edition 2024 · p. 23

Work shall not proceed beyond the point indicated at each successive inspection without first obtaining the approval of the code official. The code official, upon notification, shall make the required inspection and shall either indicate the portion of the construction…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 1401 111.6: Approval Required: | Emtithal