705.1 General
SBC 1201 · Edition 2024 · p. 130
Prior to acceptance and initial operation, all piping installations shall be inspected and pressure-tested to determine that the materials, fabrication design, and installation practices conform to the requirements of SBC 1201.
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause