العربيةSign inSign up free

503.10.2 Materials

SBC 1201 · Edition 2024 · p. 99

Vent opening connectors shall be constructed in accordance with the requirements of Sections 503.10.2.1 through 503.10.2.5.

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 1201 503.10.2: Materials | Emtithal