العربيةSign inSign up free

4A5.3 Removal of Formwork

SBC 1101 · Edition 2024 · p. 166

4A5-3-1 Before construction begins, the contractor shall establish procedures and a schedule for the removal of formwork and the installation of reshoring, and shall calculate the loads transferred to the structure during this process. 4A5-3-2 The contractor shall submit the…

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 1101 4A5.3: Removal of Formwork | Emtithal