4A5.3 Removal of Formwork
SBC 1101 · Edition 2024 · p. 166
4A5-3-1 Before construction begins, the contractor shall establish procedures and a schedule for the removal of formwork and the installation of reshoring, and shall calculate the loads transferred to the structure during this process. 4A5-3-2 The contractor shall submit the…