العربيةSign inSign up free

3C15.2 Roof Drainage

SBC 1101 · Edition 2024 · p. 146

Roof drainage systems shall be designed in accordance with the requirements of the building official, and the flow capacity of the secondary drains (overflow) shall not be less than that discharged by the primary drains and scuppers.

These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.

Read the full clause
SBC 1101 3C15.2: Roof Drainage | Emtithal