3A7.2 Selection of Floor System
SBC 1101 · Edition 2024 · p. 125
The designer shall select the floor system from the systems covered by (SBC 1101) as set forth in (Section 3A7.1). Several alternatives shall also be studied, and the final selection shall be considered as follows: (a) The geometry of the…
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.