1002.5 Connections Between Concrete Walls and Light-Frame Floor, Ceiling, and Roof Structural Systems
SBC 1101 · Edition 2024 · p. 324
Connections between concrete walls and light-frame floor, ceiling, and roof structural systems shall comply with the requirements of Section 1002.5, and with the requirements of Sections 1002.6 and 1002.7.
These are the clause's opening lines. The full clause, with its tables and exceptions, opens in the code reader.
Read the full clause