1001.8 Soil Gas Control

SBC 1001 · Edition 2024 · p. 39

The building shall be tested after construction completion for radon gas detection in accordance with the requirements of (ANSI/AARST MALB). Radon gas concentrations inside the building shall also comply with the requirements of (Section 1001.8).